According to the oil and gas company that focuses on the Mediterranean, the well was brought into production on 1 April and is currently producing at a stable dry oil rate of more than 1,000 barrels of oil equivalent pre-day on a restricted choke.
Energean said the well was drilled to a total measured depth of 5,679 meters and has penetrated 689 meters of the epsilon sandstone reservoir, in line with pre-drill expectations. Energean said the Greek company will continue to monitor and fine-tune production parameters to ensure optimal production from the well.
The EA-H3 well was drilled using Energean’s own drilling rig, the “Energean Force.”
Full article available: https://www.neweurope.eu/article/greeces-energean-completes-drilling-operation-in-gulf-of-kavala-well/