The wind farms are expected to be commissioned by 2020.
According to Siemens Gamesa, SG 2.2-122 is specifically optimised for low wind, low turbulence sites typical of the Indian market, thanks to extremely low power density and high efficiency.
Full article available: https://www.neweurope.eu/article/siemens-gamesa-to-install-new-wind-turbines-in-india/